Look-ahead scheduling resources
A free 3-week look-ahead template, practical guides for the field and honest comparisons. No sign-up needed.
Free template
3-week look-ahead template (Excel)
Free 3-week look-ahead template for Excel and Google Sheets: a 21-day bar chart that fills itself in, work days, progress and notes. No sign-up.
Guides
How to build a look-ahead and run the weekly meeting around it.
What is a 3-week look-ahead schedule?
What a 3-week look-ahead schedule is, who prepares it, what goes in it and how it connects to the master schedule, with an annotated example.
Read the guideHow to create a 3-week look-ahead schedule
Step by step: turn master schedule activities into a 3-week look-ahead, fill in each column, check readiness, get commitments and update it weekly.
Read the guideBaseline vs progress vs look-ahead schedules
How the baseline, the progress schedule and the 3-week look-ahead answer different questions: purpose, detail, ownership and update frequency compared.
Read the guideWhy look-ahead schedules fail: 7 constraints
Seven constraints to check before work starts: drawings, materials, labour, equipment, access, prior work and approvals, plus how a constraint log clears them.
Read the guideHow to update a construction progress schedule
Status date, actual starts and finishes, remaining durations and forecasts: how to update a construction schedule so delays show up early, not at the end.
Read the guideBaseline schedule review checklist
How to review a construction baseline schedule before you accept it: scope, logic, durations, calendars, critical path, float and assumptions, as a checklist.
Read the guidePercent Plan Complete (PPC) explained
What Percent Plan Complete measures, how to calculate it, why 80% PPC isn't 80% done, and how to use reasons for variance to make weekly plans more reliable.
Read the guide3-week vs 6-week look-ahead schedules
How long should your look-ahead be? Comparing 3-week and 6-week windows against lead times, approvals and complexity, and how to run both together.
Read the guideCritical path and float, explained with a look-ahead
Critical path and float explained with a slab-pour example: how a small delay moves a milestone, and why a look-ahead alone can't find the critical path.
Read the guideExcel vs construction scheduling software
When Excel is enough for construction scheduling and when to switch: a decision framework for team size, projects, versions, collaboration, logic and reporting.
Read the guideHow to run a weekly look-ahead meeting
A simple agenda for the weekly look-ahead meeting: who attends, what to review, and how to log constraints and get commitments from every trade.
Read the guide
Comparisons
Where 3WLA fits next to the tools you already use.
3WLA vs Excel and Google Sheets
Spreadsheets compared with 3WLA for 3-week look-ahead schedules: building the plan, sharing it with subcontractors, keeping one version, phones and cost.
Read the comparison3WLA alongside Primavera P6 and Microsoft Project
P6 and Microsoft Project run the master schedule; 3WLA runs the 3-week look-ahead beside it. What each is for and how to keep them in line.
Read the comparison